The Green Branch Line is a metro line of the delhi metro, a rapid transit system in Delhi, India. It consists of 3 active stations of all delhi metro network and operated by Delhi Metro Rail Corporation (DMRC). Explore delhi metro Green Branch Line route details like stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc.
Sign: π Elevated, π Underground, π At Grade, π
ΏοΈ Parking
Patna Metro completed its first trial run on the elevated track from Patna Depot to Bhootnath Metro Station, covering 4.5 km through ISBT, Zero Mile, and Bhootnath stations. The fitness trial was conducted at low speed for safety.
Chennai Metro will conduct rail grinding work on the Green and Blue Lines from September 9 to October 19, 2025. Between 5:00β6:30 am, trains will run every 14 minutes instead of 7, after which normal services will resume.
Bengaluru Metroβs Yellow Line will run every 19 minutes from September 10, improving from the earlier 25-minute gap. Train services will start at 6 am (MonβSat) and 7 am (Sun), with last trains at 11.55 pm from RV Road and 10.42 pm from Bommasandra, as per BMRCL.