mumbai-metro mumbai metro

From
To
Search Route

mumbai metro aqua line Route Map

The Aqua Line is a metro line of the mumbai metro, a rapid transit system in Mumbai, India. It consists of 27 active stations of all mumbai metro network and operated by Mumbai Metro Rail Corporation (MMRC). Explore mumbai metro Aqua Line route details like stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc.

Sign: πŸš† Elevated, πŸš‡ Underground, 🚝 At Grade, πŸ…ΏοΈ Parking

Metro Stations
Interchange
Layout
⇓
πŸš†
β‡…
πŸš†
β‡…
πŸš†
β‡… ⇄
πŸš†
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
β‡…
πŸš‡
⇑
πŸš‡

Metro Lines

Mumbai Metro Aqua Line Details

Line Color
Active Stations
27
Terminal stations

Metro Map

Network Map

Interesting facts about mumbai metro Aqua Line

The Mumbai Metro Aqua Line (Line 3) runs from Colaba to SEEPZ, covering a distance of about 33.5 km entirely undergroundβ€”Mumbai’s first fully underground metro corridor. Designed to ease pressure on overburdened roads and railways, the Aqua Line offers a fast, seamless, and air-conditioned travel experience. Once operational end-to-end, it will bring down travel time between Colaba and SEEPZ from over an hour to roughly 30–35 minutes, making it a major boost to daily commuting across South Mumbai, Bandra, and the western suburbs.

Metro News

8 September, 2025

Patna Metro completed its first trial run on the elevated track from Patna Depot to Bhootnath Metro Station, covering 4.5 km through ISBT, Zero Mile, and Bhootnath stations. The fitness trial was conducted at low speed for safety.

8 September, 2025

Chennai Metro will conduct rail grinding work on the Green and Blue Lines from September 9 to October 19, 2025. Between 5:00–6:30 am, trains will run every 14 minutes instead of 7, after which normal services will resume.

9 September, 2025

Bengaluru Metro’s Yellow Line will run every 19 minutes from September 10, improving from the earlier 25-minute gap. Train services will start at 6 am (Mon–Sat) and 7 am (Sun), with last trains at 11.55 pm from RV Road and 10.42 pm from Bommasandra, as per BMRCL.

Other Lines